Other KPIs

  • Total Production: total actual pieces produced (conforming and nonconforming)

  • Good pieces: total compliant pieces produced

  • Scrap: total nonconforming pieces produced

  • Production speed: actual production speed (measured in pieces per minute)

  • Ideal speed: plate speed of a given program (measured in pieces per minute)

  • Planned time: planned productive time through the use of the "Calendar" form

  • Ideal production: a KPI that indicates how much the machine/line can produce under maximum conditions and calculated by multiplying the ideal speed by the planned production time

  • Downtime: total time spent in downtime

  • Stops/Breakdowns/Failures: total number of forced shutdowns that have occurred